HOME CONTACT US LINKS
Areas of Expertise

Services

Project Archives

Principals

Publications

 
//
 
Air Park West Wall Failure ::

A 6 to 28 foot tall SRW constructed over soft alluvial soils failed in overall/global stability mode over about half of its 400 foot length. EIT provided the forensic failure analysis services and repair options for the site developer. The repair plans had to maintain operations of and access to the loading dock area of this manufacturing facility, which included temporary stabilization measures while wetlands permits were obtained.